Rehabilitation and Augmentation of Oloitokitok Water Supply and Sanitation Project

Name of Client: Athi Water Services Board (AWSB)

Narrative Description of Project: The ultimate objective of the project is to undertake rehabilitation of

the existing water supply and sanitation facilities such as septic tanks, on-site sanitation, ablution blocks

in Oloitokitok and carry out augmentation of the existing water supply and sanitation services; prepare

detailed design for the augmentation of water supply and sanitation services in Oloitokitok Town in

coordination with AWSB; and project management and supervision of construction of the water supply

pipelines, sewer pipelines and wastewater stabilization ponds in Oloitokitok town in coordination with

AWSB. In addition, the consultant is to prepare the tender documents [including the Specific Procurement

Notice(s)] that shall be used to procure contractors

Description of Actual Services Provided by your Staff: Design of Water Supply pipelines, sewer pipelines and waste stabilization ponds, procurement of contactors and construction supervision including defects liability period. Preparation of Bid Documents and Engineer’s Estimate.

Country: Kenya          Location within Country: Oloitokitok sub – County.

Start Date:  April 2015                       Completion Date: On Going