Electrical and Mechanical Engineering Services for the Proposed Six (6) Floor Hotel Block.
Preliminary and detailed engineering design of plumbing and drainage system, fire fighting system, air-conditioning system, solar water heating system, lighting and small power, fire alarm system, lightning protection, CCTV security system, access control, ICT system including structured cabling, electric lift, standby generator, main switchboard and power factor correction plant.
Total Project Cost – Kshs 250 Million. The Project is ongoing.
