Runji Consulting Group

Kivi Water Supply

Name of Client: World Vision, 1991

Narrative Description of Project: Detailed Design of Kivi Dam and rural water supply project. Source a 6-m impounded earth dam reservoir, intakes works and distribution system

Description of Actual Services Provided by your Staff:

Detailed Design and Tender Documents for Design and Tender Documents for Kivi dam in Kangundo

Division, Machakos District.  Main elements included (i) 6 metres homogenous earth dam (ii) A floating

pontoon intake (iii) 40 metres gabion lined spilling chute (iv) A stone pitched long stilling basin (v)

80mm, 2 Km PVC rising main, 200m3 storage tank and distribution network.

Country: Kenya          Location within Country: Machakos District, eastern Province.

Start Date: May 1991             Completion Date: October 1991

You’d like to talk to us? We are available
Get in touch with us