Detailed Feasibility Study for Two Small Hydro Power sites in Mufindi, Tanzania

Name of Client: Unilever Tea Tanzania Limited

Narrative Description of Project:  The objective of the proposed Small Hydropower project is to reduce cost in electrical energy use in tea processing factories in the area while increasing power supply reliability and reducing Greenhouse Gas emissions through the removal of barriers.

Description of Actual Services Provided by Your Staff: Preparation of Detailed Feasibility Study covering the following key elements: General assessment of the site and preliminary information, Hydrology, Site Topographic Survey, Engineering Geological Investigation, Technical sizing and estimation of power potential, Preliminary Bills of quantities and estimate of costs, Preliminary Engineering Design & Scheme Drawings, Environmental and Social Impact Assessment, Financial analysis, Training & Capacity Building

Country: Tanzania                 Location within Country: Mufindi District

Start Date:   May 2014                    Completion Date: May 2015

You’d like to talk to us? We are available
Get in touch with us