Water & Wastewater Projects

DETAILED DESIGN , BIDDING DOCUMENTATION AND WORKS SUPERVISION (WASSIP) –INFORMAL SETTLEMENT WORKS

athiThe primary and overall objective of the Consultant’s Team is to ensure that the existing documents are efficiently and efficiently reviewed and checked, new data obtained where necessary, in order to meet the scope of the assignment, as outlined in the TOR, and make recommendations to the Executing Agency as necessary in order for the documents to accurately define the works to be executed, taking care of the technical, Socio-economic, Environmental and not least Financial aspects and at the construction phase to ensure that Contractor completes the Works on time (Time Control), to the specifications (Quality Control) and within the Budget (Financial Control).

Approx. Value of Services: ( Kshs) 75 Million

Name of Client: Athi Water Services Board (AWSB)

EXTENSION OF WATER AND SANITATION SERVICES TO INFORMAL SETTLEMENTS OF MOMBASA AND MALINDI

coastThe ultimate objective of the project is to undertake feasibility study of water sanitation services; prepare detailed design for the extension of water supply and sanitation services in the target informal settlements in coordination with CWSB; and project management and supervision of construction in the informal settlements in coordination with CWSB, MOWASCO, and MAWASCO. In addition, the consultant is to prepare the tender documents [including the Specific Procurement Notice(s)] that shall be used to procure contractors and advise on optimal solutions for on-site sanitation in the informal settlements.]

Client: Coast Water Services Board (CWSB)

Location within Country: Mombasa and Malindi Districts of coast Provinces.

SUPERVISION OF WORKS AND SAFETY COORDINATION IN EXECUTION PHASE FOR THE REHABILITATION OF THE WATER AND SANITATION SYSTEMS OF KIAMBERE BASIN.

tanathiSupervision of works, measurement, accounting, safety coordination in execution phase for the project: “rehabilitation of the water and sanitation systems of the Kiambere basins”: phase II – “Kiambere – Mwingi water supply, sanitation system, capacity building’.

 

 

 

 

Capacity of the Water Supply System: 3690m3/day

Waster water Capacity for Mwingi Township: 2220m3/day

Approx. Value of Services: € 650,000

Client: Tanathi Water services Board

KIAMBERE – MWINGI WATER SUPPLY PROJECT PHASE II -MWINGI DISTRICT

kiambereFeasibility Study and Detailed Engineering Design including preparation of Bid Documents. The project aims at developing and handing over to the local community, a reliable and portable water supply for human and, to a large extent, livestock consumption in Kandwia, Katse, Kimangau, Kyuso, Tseikuru and other small market centres in Mwingi District, Eastern Province, Kenya.

 

Approx. ultimate demand:10,000 m3/day

Ultimate population size to be served: 215,000

Project cost: € 12 million