Runji Consulting Group

Stima Plaza Phase Iv: Design And Supervision

Electrical and Mechanical services to 4 floor office block at Hurlingham.

Preliminary and detailed engineering design of plumbing, drainage fire fighting and air conditioning systems, lighting, small power, large power and fire alarm systems.

Mechanical Services for the 12 floor office block.

Works comprised of Plumbing / Drainage, Rainwater disposal, Fire fighting installations and borehole water supply.

Cost of Mechanical works, US $ 500,000 in a scheme of overall cost of US $ 5 million, Kenya Power &Lighting Company ltd(KPLC), 1999.

You’d like to talk to us? We are available
Get in touch with us