Runji Consulting Group

Consultancy Services for Feasibility Study, Preliminary and Detailed Engineering Design of Upper Hill Overpasses and Nairobi Western Region Missing Links – Ring Road Kileleshwa/Arboretum overpass bridge – Haile Selasie flyover – Langata road-Masaba road rail overbridge – Kenyata Av./NSSF flyover – Valley Road/Raph Bunche overbridge

Name of Client: Kenya Urban Roads Authority

Narrative description of Project: Feasibility Studies, Preliminary and detailed engineering design for junction improvements by grade separation at selected intersections in Nairobi. Further to the overpasses, the missing links in Nairobi West are also to be designed for to improve traffic circulation.

Description of actual services provided by your staff within the assignment:  Highway Geometric Design, Economic analysis, structural engineering, materials engineering, surveying, preparation of bid documents, cost estimates, environmental and socio-economic studies.

Country: Kenya         Location within country:  Nairobi

Start date (month/year):  March 2016 Completion date (month/year):  Ongoing

You’d like to talk to us? We are available
Get in touch with us