Oil & Gas

UPGRADE OF WESTERN KENYA PIPELINE EXTENSION.

UPGRADE OF WESTERN KENYA PIPELINE EXTENSION.A Joint Venture between Shengli Engineering and Consulting Company Limited of China and Runji & Partners Consulting Engineers & Planners Limited. The project involved the design and supervision of the installation of a 355mm diameter pipeline from Nairobi to Eldoret, over a distance of 326 km. The objective of the project was to enhance the pumping capacity from 220m3/hr to 757m3/h. Booster and mainline pumps were installed as well as pigging facilities. The pipeline was constructed parallel to the existing 8 inches diameter pipeline.

Client: Kenya Pipeline Company Ltd.

GAS PIPELINE PROJECT

TANZANIA GAS PIPELINE PROJECTFeasibility Study for a Natural Gas Pipeline from Dar es salaam to Tanga (Tanzania) and Mombasa (Kenya) in association with COWI A/S (Denmark) and COWI Tanzania.

Undertook the route location for the proposed project, Technical feasibility of the project, Economic and financial evaluation and Environmental and social impact assessment and mitigation measures.

The Project is complete.

Total Project Cost: US$ 500,507.00.